Studies & Reports

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

2022 Local Water Supply Plans

Dare Regional (NRO & Skyco WTP)
Stumpy Point
RWS (Joseph Mac Midgett WTP)
Cape Hatteras 

Hydrogeology Reports

Hydrogeological Reports Summary
Listing reports completed 1972-2006

Potential Groundwater Supplies for Roanoke Island and Dare Beaches
Prepared by NC DENR in 1972

Dare Beaches Preliminary Engineering Report for Regional Water and Sewerage
Prepared by Henry Von Oesen and Associates Inc. in 1974

Preliminary Engineering Report for Expansions to Roanoke Island
Prepared by Henry Von Oesen and Associates Inc. in 1975

Groundwater Movement at Fresh Pond
Prepared by Moore, Gardner & Associates Inc. in 1979

Comprehensive Engineering Report on System Improvements for County of Dare
Prepared by Moore, Gardner & Associates Inc. in 1984

Yorktown Aquifer Vol 1
Prepared by: Missimer & Associates in 1992

Yorktown Aquifer Vol 2
Prepared by Missimer & Associates in 1992

Roanoke Island Ground Water Monitoring
Prepared by the NC Department of Environment, Health & Natural Resources in 1993

Roanoke Island Ground Water Monitoring
Prepared by the NC Department of Environment, Health & Natural Resources in 1994

Roanoke Island Ground Water Monitoring
Prepared by the NC Department of Environment, Health & Natural Resources in 1995-1996

Albemarle Water Resources Task Force Study
Prepared by Hobbs-Upchurch in 1996

Aquifer Storage and Recovery (ASR)
Prepared by CH2MHill in 1997

County-Wide Hydrogeological Study
Prepared by Missimer International Inc. in 1998

Albemarle Region Aquifer Studies
Prepared by NC Department of Environment and Natural Resources in 1998

Albemarle Regional Aquifer Studies Annual Report
Prepared by NC Department of Environment and Natural Resources in 2006

Roanoke Island Groundwater Study
Prepared by Groundwater Management Association in June 2008

Division of Water Quality Report

Chowan River Basin Water Quality Management Plan
Prepared by NC Division of Water Quality in 1997

Wellhead Protection

2013 Wellhead Protection Plan
Revised March 2014
Prepared by NC Rural Water Association

Part 1
Part 2
Part 3

Cape Hatteras (Cape Hatteras Water Plant)

Cape Hatteras Water Association Aquifer Studies
Prepared by John E Serine and Associates from 1984 to 1991

Environmental Assessment
Prepared by Hobbs-Upchurch in 1995

Future Water Supply Study
Prepared by Boyle Engineering in 1995

RO Test Well Report FINAL
Prepared by Boyle Engineering in 1995

Distribution Upgrades Study
Prepared by Hobbs-Upchurch in 1997

Engineering Contracts
Prepared by Hobbs-Upchurch in 1997

Pilot Plant Study
Prepared by Hobbs-Upchurch and Boyle Engineering in 1997

RO Wellfield Study
Prepared by Missimer International in 1998

NPS Water Quality Cape Point
Prepared by Luizer, and  Broili in 2006

Nanofiltration Pilot Program Final Report
Prepared by RosTek Associates, Inc. in 2007

Rodanthe, Waves, and Salvo (Joseph Mac Midgett Water Plant)

Feasibility Study
Prepared by Black& Veatch in 1993

Environmental Assessment
Prepared by Black & Veatch in 1994

Production and Distribution Design Report
Prepared by Black & Veatch in 1994

Wellfield Report
Prepared by ViroGroup in 1995

Nanofiltration Pilot Program Final Report
Prepared by RosTek Associates, Inc. in 2007

Yorktown Test Well
Prepared by Groundwater Management Association in 2008

Nags Head (Nags Head Water Plant)

Nags Head Needs Assessment
Prepared by Cavanaugh in 2005

Fresh Pond Filter Assessment Preliminary Engineering Report
Prepared by The Wooten Company in 2006

Part 1
Part 2

North RO (NRO Water Plant)

Design Report
Prepared by Black& Veatch in 1987

Yorktown Aquifer: NRO's Impact on Water Table
Prepared by ViroGroup in 1994

Wells 9 & 10 Construction and Testing
Prepared by ViroGroup in 1994

Potential Capacity Increase DRAFT
Prepared by Boyle Engineering in 1995

Orville Test Well Report
Prepared by Missimer International in 2000

Well 17 Test Well Report
Prepared by CDM Missimer in 2002

Arsenic Project Preliminary Design Report
Prepared by RosTek Associates Inc. in 2002

Plant Expansion Preliminary Design Report
Prepared by RosTek Associates Inc. in 2002

Plant Expansion Final Report
Prepared by RosTek Associates Inc. in 2003

Wells 11-16 Testing Report
Prepared by CDM Missimer in 2003

Wilbur Well Completion Documents
Prepared by CDM in 2004

Wilbur Well Completion Data
Prepared by CDM in 2004

Well 15 Completion Data
Prepared by CDM in 2005

Orville Well Completion Data
Prepared by CDM in 2005

Roanoke Island

Wanchese Water Study
Prepared by Quible Associates in 1989

Manns Harbor Water System Study
Prepared by CDM in 2006

Roanoke Island Manteo Wanchese Water System Study
Prepared by CDM in 2006

Test Well Exploration of the Yorktown Aquifer beneath Roanoke Island
Prepared by Groundwater Management Association in 2009

Water System Expansion Final Preliminary Engineering Report
Prepared by CDM in December 2009

Roanoke Island Water System Improvements, Geotechnical Data Report
Prepared by CDM in April 2010

Skyco (Skyco Water Plant)

Anix Color Removal System Design Manual
Prepared by Boyle Engineering, Quible and Associates, and RosTek Associates in 2000

Well 6 Aquifer Test formally Well 9
Prepared by CDM in 2003

Well 6 Conceptual Design Report formally Well 9
Prepared by CDM in 2003

Well 6 Completion Data formally Well 9
Prepared by CDM in 2004

Anion Vessel Evaluation
Black & Veatch in 2008

Test Well Exploration of the Yorktown Aquifer
Groundwater Management Association in 2009

Stumpy Point (Stumpy Point Water Plant)

Stumpy Point Application for State Grant
Prepared by Hobbs, Upchurch in 1999

Stumpy Point Preliminary Design Report
Prepared by Hobbs, Upchurch in May 2000

Report on Construction and Testing of Upper Yorktown Aquifer Test Well at Stumpy Point
Prepared by Missimer International in January 2001

Geotechnical Report - Stumpy Point
Prepared by Hobbs, Upchurch in March 2001

Environmental Assessment for Stumpy Point Water and Sewer District
Prepared by The Wooten Company in 2003

 

North Distribution

Distribution Construction Specifications
Prepared by Dare County - 1999

Regional Water System Northern Beaches Capacity Increase Study
Prepared by Rostek Associates – May 2012

Dare Beaches Water Supply System PDR
Prepared by Henry Von Oesen & Associates Inc. in 1973

Dare Beaches Water Supply System PDR Supplement
Prepared by Henry Von Oesen & Associates Inc. in 1974

Water Supply and Treatment Alternatives
Prepared by Moore, Gardner Associates in 1984

System Report
Prepared by Black & Veatch in 1986

Water Supply and Treatment Alternatives
Prepared by Black& Veatch in 1987

Dare Beaches Water Supply: Fresh Pond to Reverse Osmosis
Prepared by Black & Veatch in 1989

Town of Southern Shores - Chicahauk Water System Expansion
Prepared by Malcolm-Pirnie in 1991

Regional Distribution Improvements
Prepared by Black& Veatch in 1993

Regional TTHM (Total Trihalomethane) Study
Prepared by Black & Veatch in 1993

Regional Expansion Financial Feasibility Study
Prepared by Black& Veatch in 1994

South Distribution

Wellfield Study
Prepared by Ralph C. Heath in 1990

Miscellaneous

Color and THMFP Removal Pilot Test
Prepared by Boyle Engineering in 1998

Page last updated November 2, 2009