Dare County, NC
MenuFee Schedule
Building Permits-Residential |
Effective 9-1-2017 |
Fees based on per sq ft. |
Heated/Non-heated |
1 & 2 family dwellings |
$0.75/0.40 |
Modular homes |
$0.75/0.40 |
Mobile homes (only charge for heated) |
$0.50 |
Additions and enclosures |
$0.75/0.40 |
Accessory structure with any dimension over 12 ft. |
$0.75/0.40 |
Accessory structure with any dimension less than 12 ft. |
Flood development permit only |
Commercial Building Permits
|
Heated/Non-heated
|
Assembly (churches, restaurants, theaters) |
$0.95/$0.65 |
Business (banks, offices) |
$0.95/$0.65 |
Educational (school, child care centers) |
$0.95/$0.65 |
Institutional (jail, hospital, nursing home) |
$0.95/$0.65 |
Mercantile (retail, drug store, market) |
$0.95/$0.65 |
Factory industrial (plant, boat building) |
$0.95/$0.65 |
Storage (rental units, except hazardous) |
$0.95/$0.65 |
Hazardous (any of the above) |
$0.95/$0.65 |
R-1 (hotel, motel, dorm) |
$50 unit + $0.95/0.65 heated/unheated |
R-2 (condo, apartment) |
$100 unit + $0.95/0.65 heated/unheated |
Building Permits – Residential or Commercial |
|
Docks, piers, bulkheads, dune walks(flat) |
$250 |
Swimming pools (flat fee) |
$300 |
Hot tubs (flat fee) |
$300 |
Communication towers, water tanks (per vertical foot) |
$20.00 per vertical ft |
Antenna (installation, replacement on communication towers, water tanks--per antenna/unit replaced) |
$300 per antenna |
Gas pumps (installation, replacement) per pump |
$250 |
Fuel Tanks (installation, replacement) per tank above and underground |
$500 |
Wind turbine (per vertical foot) |
$3.00 per vertical foot |
Flood development permit |
$75 |
CAMA minor permit |
$100 |
Remodel, alteration per $1000 cost |
$10.00 per $1000 of costs |
Signs up to 64 sq. ft. (includes electrical) flat fee |
$150 |
Signs over 64 sq. ft. (includes electrical) flat fee |
$250 |
Change of use with no remodel --flat fee |
$150 |
Moving permit-- flat fee |
$200 |
Minimum building permit fee |
$150 |
Re-inspection fee |
$100 |
Demolition permit (not associated with building replacement) |
$250 |
Permit renewal fee (must be renewed within 30 days of expiration) |
Treated as new permit |
Penalty for starting work without permit |
Original permit cost + 50% |
Penalty for failing to call for inspections |
50% of original permit cost |
Electrical Permits |
|
New construction – residential |
Included in building permit |
Remodel and alteration |
Included in building permit |
Service change – line side including panel board |
$150 |
New service, not requiring separate building permit |
$150 |
Service upgrade, not requiring separate building permit |
$150 |
Add circuits to existing panel |
$150 |
Generator sets |
$150 |
Minimum permit fee |
$150 |
Plumbing Permits |
|
New construction |
Included in building permit |
Remodel and alteration |
Included in building permit |
Fixture replacement, relocation/addition not requiring separate building permit |
$150 |
Minimum permit fee |
$150 |
Mechanical Permits |
|
New construction |
Included in building permit |
Remodel and alteration |
Included in building permit |
Change outs up to 3 units |
$150 |
Change outs -- 4 or more units |
$50 per unit |
Minimum permit fee |
$150 |
Gas Permits – Installation |
$150 |